Choose the cladding before ordering the pier caps and wall coping. Brick slips or manufactured stone, together with the adhesive, increase the finished size of every clad face. The same planning exercise should establish the visible areas, external corners and junctions at gates, wall ends and ground level.

Here, a plinth means the low band of wall above ground level, either at the base of a house or beneath fence panels. Pillars are the piers supporting gates or dividing wall runs. Ristone’s brick slips and manufactured stone cladding are concrete finishes; they do not replace the structural wall or its waterproofing.

Resolve the substrate and water details first

Check that the substrate is stable, clean and suitably prepared, and that the fixing materials are suitable for the chosen concrete cladding and exterior exposure. For insulated plinths, verify the weight, adhesive and fixing arrangement with Ristone and the insulation system manufacturer before specifying the finish.

The final ground or paving level matters. Plan the base junction and drainage from that level, including the connection to the project’s waterproofing.

A German refurbishment detail illustrates why the splash zone needs separate attention: Remmers specifies splash-water protection to 300 mm above ground when renewing existing plinth finishes, connected to the below-ground waterproofing. Its render protection extends at least 50 mm above ground and overlaps the existing waterproofing (Remmers, Sockel-Fibel, 2024). These dimensions belong to that detail. They are neither a universal decorative cladding height nor a UK rule. The appropriate junction is established for the actual project.

Choose the finish and corner solution together

Brick slips give regular courses and visible joint lines. Manufactured stone offers different textures and relief depending on the model. Ristone calculates its stone cladding without a joint allowance and brick slips with a joint of about 10 mm; confirm the selected model’s installation layout.

Some models have dedicated external corner pieces. See the brick slip corners guide for model-specific components and ordering checks. Where they do not, agree the corner detail under that model’s instructions before assuming cut flat pieces are suitable. Compare samples of any proposed combination in the same natural light, including the cap and coping colour.

Measure the surfaces that will actually be clad

Record dimensions in mm and convert areas to m² by dividing square millimetres by 1,000,000.

For a house plinth, add the lengths of the clad walls, multiply by the clad height and deduct openings. Include any reveals or returns being clad as separate areas. Record external corners separately.

For example, a house 12,000 × 10,000 mm has a perimeter of 44,000 mm. A 500 mm high plinth gives 22 m². Deducting a 1,000 mm wide doorway across that band leaves 21.5 m². Four external corners at 500 mm high give 2,000 mm of corner height, measured separately from the flat area.

For a wall base, use clear run length × clad height × number of clad faces. For a rectangular pillar with four exposed faces, use 2 × (width + depth) × clad height. Multiply by the number of identical pillars, then deduct faces or parts concealed by walls, gates or other construction.

Worked boundary-wall example

Assume six square pillars, each 400 × 400 mm, clad to a height of 1,500 mm on all four faces. Between them are five clear wall runs of 2,700 mm, each 600 mm high and clad on both sides. For this geometric example there are no openings or concealed areas.

SurfaceCalculation in mmArea
Pillars4 × 400 × 1,500 × 6 ÷ 1,000,00014.4 m²
Wall base5 × 2,700 × 600 × 2 ÷ 1,000,00016.2 m²
Total before corner allocation14.4 + 16.230.6 m²

The pillars also have 4 × 1,500 × 6 = 36,000 mm of external corner height. On a real wall, deduct concealed pillar faces and concealed corner segments. Where corner pieces cover part of the faces, subtract the area of their returns before counting flat pieces. The 30.6 m² is therefore not a quantity of flat cladding to order unchanged, and corner length is not added to it as an area.

Check coverage before converting to boxes

Historical catalogue figures are not all expressed on the same apparent basis. Oxford, Berlin and Ribe figures approximately match net slip area, while Belgrad approximately matches coverage with a 10 mm joint. These are approximate historical comparisons, not confirmed current conventions.

A wall area includes joints. Dividing it by net slip coverage overstates the box count. Ask Ristone to confirm boxes and corner packs for the chosen joint width; the brick slip quantity guide explains the calculation.

Size the caps and coping from the finished faces

Add cladding and adhesive on each face to obtain the finished pillar and wall dimensions. Then check the cap or coping overhang. Ristone gives 30–50 mm per side as a guide, subject to the profile and installation.

US masonry guidance recommends an overhang on both sides, slope and a drip to help shed water beyond the wall faces (BIA, Technical Notes 36A, revised 1981, reissued 2001). It is general guidance, not a UK regulation or a specification for every Ristone product. Confirm the chosen model’s detail.

See cap and coping sizing and coping quantities and joints before finalising the schedule.

Prepare the project enquiry

Send a sketch showing the faces to be clad, openings, corners, substrate, insulation if present, model and colour, and the intended finished dimensions. Include the destination country, postcode and required date. Order the full quantity for one visible surface together where possible, because small shade differences between batches are possible.

Ristone supplies from Romania to the UK and the rest of Europe on a quotation basis, depending on product, quantity and destination. For the UK, transport, customs duties and import VAT are paid by the buyer.

See concrete brick slips and stone cladding, or request a project quote.

Sources

Before you order.

Should I choose the cladding before the pier caps?

Yes. Establish the cladding and adhesive thickness on each face, then size caps and coping from the finished dimensions.

How do I measure cladding for a rectangular pillar?

For four fully exposed faces, use 2 × (width + depth) × clad height. Deduct hidden areas and record external corner heights separately.

Does plinth cladding replace waterproofing?

No. It is a finish. Waterproofing, its junctions and the suitability of the substrate must be resolved in the project design.

Can I combine stone on pillars with brick slips on the wall base?

The combination can be considered, with model and substrate suitability checked first. Include the different finish thicknesses when sizing caps and coping, and compare samples together.

Check the choice for your project

The examples are indicative. Send the finished dimensions and ask us to check the product and quantities.